久久精品第九区免费观看,亚洲精品无码鲁网午夜,午夜国人精品av免费看,国产精品无码嫩草地址更新

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.tnxrx.cn

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

无码人妻一区二区三区精品视频| 久久国产色av免费看| 国产精品a国产精品a手机版| 欧美日韩一区二区三区自拍 | 亚洲人成网站在线播放大全| 国内精品无码一区二区三区| 国产乱码一区二区三区爽爽爽| 国产白丝jk捆绑束缚调教视频| 清纯唯美经典一区二区| 亚洲熟妇无码久久精品| 水蜜桃av无码| 国产成人免费ā片在线观看| 欧美老妇与zozoz0交| 亚洲精品乱码久久久久久自慰| 国产日韩欧美不卡在线二区| 人妻护士在线波多野结衣| 精品国产一区二区三区麻豆| 日韩a人毛片精品无人区乱码| 色欲天天网站欧美成人福利网| 一本无码人妻在中文字幕| 亚洲高清一区二区三区电影| 国内精品视频一区二区八戒| 欧美人与动牲交xxxxbbbb| 国产精品人妻一区二区三区四| 末成年女av片一区二区丫| 亚洲人成未满十八禁网站| 97国产精华最好的产品亚洲| 久久久国产精华特点| 东京热无码av一区二区| 精品国产精品三级精品av网址| 国产熟妇搡bbbb搡bbbb| 性xxxx欧美老妇胖老太性多毛| 亚洲精品久久久久久无码色欲四季 | 女邻居丰满的奶水| 蜜桃视频一区二区三区在线观看| 少妇无码av无码专区在线观看| 日韩人妻精品无码一区二区三区| 把腿张开老子臊烂你多p视频| 亚洲av成人一区二区三区| 肥臀浪妇太爽了快点再快点| 免费人成再在线观看网站 |